Pemspring Industrial Decarbonisation Index
A register of industrial electrification indicators — what each one measures, how often it publishes, what it draws on, and where it stands. Every definition is permanent from the day it is registered, whether or not it has a value yet.
15 active indices in 5 panels. 15 publish a value today; the rest have a permanent page stating what they measure, when they will publish, and what is holding them.
Economics & Flexibility
| Index | Code | What it measures | Cadence | Latest |
|---|---|---|---|---|
| Industrial Heat Parity COP | PIDI-E | Break-even COP at which electric heat matches a reference gas boiler on energy cost | Monthly | 5.271 COP (dimensionless) 2026-05US, 1 of 3 markets |
| Electric Heat Cost Advantage Hours | PIDI-H | Share of settlement periods in which electric heat has a lower energy cost than the reference gas boiler | Monthly | 99.66 percent 2026-03GB_power_UK_gas · Modelled |
| Battery Peak-Shaving Value | PIDI-B | Illustrative battery demand-charge avoidance under frozen demand-charge scenarios | Monthly | 120 USD per kW-year 2026-09-18US_reference · Reference scenario |
| Thermal Storage Opportunity Index | PIDI-T | Gross flexibility value of dispatching a frozen reference thermal store against market prices | Monthly | 17.17 GBP/kWth-year 2026-08GB · Modelled |
Deliverability
| Index | Code | What it measures | Cadence | Latest |
|---|---|---|---|---|
| AI Infrastructure Energisation Gap | PIDI-A | Share of publicly announced AI/datacentre MW with explicit evidence of energisation in the open records of each covered market, reported separately per market | Monthly | 70 % of announced MW in the observed cohort with energisation evidence 2026-09US · Texas observed cohort — 2 of 8 projects, single issuer (IREN) · Observed cohort |
| GB Contracted Demand Queue Volume | PIDI-G | The capacity represented by contracted demand connection offers in Great Britain | On publication of a new comparable official snapshot | 125 GW 2025-06GB |
| Electrification Lead Time Pressure | PIDI-L | Movement in unfilled orders relative to shipments for US NAICS 335 electrical equipment | Quarterly | 153.9 index, 2019 annual average = 100 2026-Q2US · Public proxy |
Capital & Infrastructure
| Index | Code | What it measures | Cadence | Latest |
|---|---|---|---|---|
| Capital Cost of Abatement | PIDI-C | Movement in the published producer prices of a fixed basket of electrification capital equipment, rebased to 100 at 2019-01 | Monthly | 126.95 index, 2019-01 = 100 2026-07EU27_2020, 1 of 2 markets |
| Electrification Enabling Cost Ratio | PIDI-D | Enabling-works capex as a ratio of core electrification equipment capex | Quarterly | 0.1359 ratio of enabling to core equipment capex 2023US |
| Electrical Infrastructure Burden | PIDI-I | Modelled electrical enabling capex per incremental electrical capacity for frozen reference architectures | Quarterly | 157.22 EUR (2020 price level) per kWe 2026-09-18DK_component_reference · Reference scenario |
Carbon & Credibility
| Index | Code | What it measures | Cadence | Latest |
|---|---|---|---|---|
| Electric Heat Carbon Advantage Hours | PIDI-CA | Share of settlement periods in which electric heat is lower-carbon than the reference gas boiler | Monthly | 100 percent 2026-08GB · Modelled |
| Verification Gap | PIDI-V | Completeness of public post-implementation savings and independent-verification evidence | Annual | 100 % of eligible implemented records 2025US |
| PEICI Equipment-Class Data Readiness | PIDI-R | Whether the published PEICI calculator models are operationally usable and auditable | Annual | 14.3 % of equipment classes 2026-09-21PEICI |
Nuclear Decarbonisation
| Index | Code | What it measures | Cadence | Latest |
|---|---|---|---|---|
| Nuclear Heat–Power Carbon Leverage | PIDI-N | Ratio of direct gas-heat CO2 displacement to electricity CO2 displacement for equal reactor thermal energy | Annual US and UK; quarterly commentary retains latest annual observation | 3.93 x (dimensionless ratio) 2025UK, 1 of 2 markets · Modelled |
| Nuclear Heat Competitiveness Ceiling | PIDI-NH | Maximum all-in delivered nuclear heat tariff matching reference gas-boiler fuel expense | Quarterly UK; annual UK and US | 56.35 GBP per MWh useful heat 2026Q1UK, 1 of 2 markets · Modelled |
Retired
These indicators were retired before first publication. Their pages are permanent and their codes are never reused.
- Solar Self-Consumption Spread PIDI-S — Portfolio refocused on industrial electrification economics, capital and evidence. Code never to be reused.
- Transition Finance Delivery PIDI-F — Portfolio refocused on industrial electrification economics, capital and evidence. Code never to be reused.