Thermal Storage Opportunity Index

Gross flexibility value of dispatching a frozen reference thermal store against market prices

GB

17.17

against a 1 kWth continuous useful-heat requirement

GBP/kWth-year

2026-08 · monthly

Modelled

Observations
120
Annual meanRange within the yearInterquartile range
050100150200250GBP per kWth-year2017part2018part2019part2020part2021part2022part2023part20242025part2026part

Series begins 2017 · 71 observations

Realised gross saving from a frozen reference thermal store on a causal fixed schedule, per kWth of reference demand.

What this figure cannot support

PROVISIONAL GROSS MODEL on a causal calendar strategy — not an optimised upper bound and not a site investment return. Months below 95% day coverage are absent, and the chart breaks across them. A negative result is possible and is not clipped.

How this index is calculated

Table view and CSV
YearMeanMinMaxP25P75n
2017 (part)27.83025.11531.66225.91429.1883
2018 (part)13.84913.84913.84913.84913.8491
2019 (part)24.33614.74730.41821.29429.1303
2020 (part)23.82817.70335.37718.70224.9945
2021 (part)109.31934.831205.33955.154147.7346
2022 (part)106.99346.217159.54481.465130.99611
2023 (part)53.37818.040113.18532.29963.66011
202443.28224.45487.30533.56949.94312
2025 (part)41.38514.657109.10424.39650.18211
2026 (part)29.73517.16851.44519.83335.4228

Download the annual summary as CSV
Download every observation, with its lineage, as CSV

What was assumed

ParameterValueEvidenceBasis
(GB, GB, GB, GB, GB, GB, GB, GB, GB, GB, GB, GB, GB, GB, GB)

Source attribution

Elexon BMRS data licence.

Definition

What it measures
Realised gross saving from a frozen reference thermal store on a causal fixed schedule, per kWth of reference demand
Headline metric
currency per kWth-year gross flexibility value
Supporting metrics
currency per MWhth-storage-year; economically useful cycles; share of charging in low-price hours
Cadence
Monthly
Panel
Economics & Flexibility
Primary sources
elexon-bmrs-data; frozen Pemspring reference-store assumptions
Licence position
clear — BMRS data licence; automated API path excluded at launch
Release gate
licensed data export archived; reference-store method published; >=95% coverage; back-test and no-look-ahead checks pass

What this does not cover

PROVISIONAL GROSS MODEL. Excludes capex, financing, maintenance, degradation, process constraints and site network/demand charges unless explicitly modelled.