Electrification Enabling Cost Ratio
Enabling-works capex as a ratio of core electrification equipment capex
US
0.1359
against core equipment capex
ratio of enabling to core equipment capex
2023 · one vintage
- Observations
- 10
This series is too short to chart. It publishes as a figure until five years of observations exist.
Source attribution
Source: US Energy Information Administration.
Definition
- What it measures
- Enabling-works capex as a ratio of core electrification equipment capex, across EIA reference generating technologies whose published cost categories separate the two
- Headline metric
- median ratio
- Supporting metrics
- P25; P75; sample size; by sector; by technology; brownfield or greenfield
- Cadence
- Quarterly
- Panel
- Capital & Infrastructure
- Primary sources
- eia-capcost
- Licence position
- clear — US public domain
- Release gate
- source totals reconcile; enabling/core crosswalk reviewed; technology, utility-scale scope and cost year visible
- Replaces
- PIDI-D Enabling Infrastructure Drag
What this does not cover
PROVISIONAL PUBLIC-BENCHMARK PROXY. It is technology-limited and utility-scale; it is not a general industrial-electrification or Pemspring-project ratio.