Electrical Infrastructure Burden
Modelled electrical enabling capex per incremental electrical capacity for frozen reference architectures
First reference release · DK_component_reference
157.22
EUR (2020 price level) per kWe
Danish component scope at 2020 EUR price level. NOT a UK or US observed installation cost, and not converted to either.
- Low — reuse a station with demonstrated spare capacity, 100 m feeder35.23incremental kwe 500 · station count 0 · station mva 0.8 · power factor 0.9 · station rate eur mw 40408.163284 · feeder length m 100 · feeder rate eur m 79.75295385 · service line eur 9640.537061388
- Base — one new station, 500 m feeder157.22incremental kwe 500 · station count 1 · station mva 0.8 · power factor 0.9 · station rate eur mw 40408.163284 · feeder length m 500 · feeder rate eur m 79.75295385 · service line eur 9640.537061388
- High — two stations, 1,000 m feeder295.16incremental kwe 500 · station count 2 · station mva 0.8 · power factor 0.9 · station rate eur mw 40408.163284 · feeder length m 1000 · feeder rate eur m 79.75295385 · service line eur 9640.537061388
- A modelled reference design, not observed project cost.
- Station cost bundles transformer and switchgear; they must not be charged again elsewhere.
- The feeder and the source's separate 100 m LV service line are different assets.
- No upstream reinforcement, utility connection fee, site-specific land, exceptional civils or permitting allowance is included.
- The two-station case is a cost scenario, not a certified N-1 design.
- No backcast is supplied: escalating these to earlier years would be an escalation model, not observed historical projects.
Definition
- What it measures
- Modelled electrical enabling capex per incremental electrical capacity for frozen reference architectures
- Headline metric
- Modelled Electrical Infrastructure Burden, currency per incremental kWe
- Supporting metrics
- low/base/high architecture; voltage class; transformer/switchgear/cabling components; cost year
- Cadence
- Quarterly
- Panel
- Capital & Infrastructure
- Primary sources
- doe-tsd; doe-xfmr-rule; doe-lpt; PEICI cleared grid factors; published Pemspring design assumptions
- Licence position
- clear public-domain inputs plus Pemspring assumptions
- Release gate
- reference architectures, factor IDs, cost scope, exclusions and sensitivity band published
What this does not cover
PROVISIONAL ENGINEERING MODEL, not observed project cost. Civil works, connection charges and site conditions are represented only if explicitly included.