Screening-level installed cost for boilers, process heaters and thermal storage.

Rating basis throughout this group is MW thermal delivered, never electrical input. Where a conversion from the native unit is offered it is shown on screen with its assumptions, and you can change them.

Download the heat estimating card — a printable one-page summary of every parameter below, the validity ranges, the accuracy class and a worked example. No subscription needed. Metric edition · Imperial edition. The two carry the same numbers: a unit conversion is exact and reversible, and costs are in USD on both.

Estimate

More from a subscription

The calculator above is free and needs no account. Subscribing to the monthly index adds the detailed downloadable estimate, the project-cost waterfall, scenario comparison, sensitivity analysis, CSV and data exports, and index alerts. It opens as soon as you confirm your email address.

See the published factor table for this group

What is in this group

Two headline technologies — high-temperature industrial heat pumps and electric boilers — are listed but disabled. The only public source with capacity-varying cost data for them has an unresolved licence, and we would rather show you an empty row with the reason than substitute a proxy and let you quote it.

The published data

Every parameter this calculator uses is published and ungated: see the heat factor table, the exponent register and the method note. The factor set is versioned, and a result you export records which version produced it.

General material, not engineering advice for a specific site. Order-of-magnitude only. Not a basis for capital approval or for committing to a contractor.

Discuss whether this fits

Tell us the problem, the site and the decision you need to reach. If this is not the right service we will say so and point you at the one that is.

United Kingdom and United States enquiries are routed to the same team. We will tell you plainly where we do and do not have local delivery capability.