The problem this solves
You are being asked whether to electrify, when, and at what cost — and the numbers available to you are a vendor’s, a consultant’s, or an industry body’s press release. None of them shows its method, and none of them will tell you what it does not know.
The trigger is usually a question you cannot answer from inside the organisation: what should this equipment cost, is the economics moving for or against us, how long will a connection take, and how much of what we are being told is evidence rather than sales.
Who it is for
Organisations making capital and strategy decisions about industrial electrification who need figures with a stated method, a stated source and a stated uncertainty — and teams who need to put a number in a board paper and defend where it came from.
Who it is not for
If you have a site and want to know what to do with it, start with an Energy Opportunity Sprint.
If you have an identified opportunity and a capital approval ahead of you, that is a Project Feasibility Pack — this service supplies its cost basis, it does not replace it.
If you want technology development, product testing or laboratory work, we do not do that and will say so.
Scope and stages
Published indices. The Pemspring Industrial Decarbonisation Index and the Pemspring Energy Infrastructure Cost Index, free to read, with full method notes, source licences and revision logs. Not gated, not summarised, not a lead magnet.
Cost baseline. What defined equipment should cost at your capacity and in your region, from the published cost–capacity relationships, with the uncertainty stated and the exclusions named. The Estimating Cards are the same relationships in a form you can use yourself.
Market position. Where the economics currently sit for your process and fuel, and how far that has moved — including the within-year range, not just the annual average.
Deliverability read. Equipment lead-time pressure and grid connection conditions relevant to the decision, on published sources, with what those sources cannot tell you stated plainly.
Bespoke extension. Where a question needs data we do not publish, we scope the work to obtain it, state what it will and will not settle, and price it separately.
Method transfer. For teams who want to maintain the analysis themselves, the method, assumptions and calculation are handed over rather than retained.
What you get
- A written answer to the question asked, with the figures, their sources and their uncertainty
- The underlying data as CSV, and the calculation, not only the conclusion
- A statement of what the available data cannot support
- Where relevant, a citable published index page that your own document can reference
The decision this supports: whether to commit, when to commit, and what to budget — and how much confidence the answer carries.
Maturity, assumptions and exclusions
Output is at pre-screening maturity. It is intended to frame and test a decision, not to price a project. Cost figures carry a screening uncertainty envelope and are not a tender price.
- Not a substitute for site-specific engineering, load analysis or design
- Not market sizing, investor due diligence or competitor research
- We do not publish or supply data whose licence does not permit it, and we will name the source that is blocking an answer rather than substituting a weaker one
- Where an index has no observations, we say so. We do not produce an estimate to fill the gap
Where a question touches a GMP process, a pressure system, a hospital critical service, electrical protection or refrigerant safety, the relevant specialist review is named in the output. We do not sign off outside our competence.
Commercial structure
Published indices are free and stay free.
Bespoke analysis is fixed fee, priced after scoping. Method transfer is priced as a defined engagement. Where a question can be answered from what is already published, we will say so rather than scope work around it.