Taking a prioritised opportunity far enough that a capital decision can defensibly be made.

What happens

  • Establish the load and demand basis from data
  • Compare options genuinely, including doing nothing and doing less
  • Produce concept design sufficient to support the estimate and expose integration issues
  • Build project economics with sensitivities on the assumptions that actually move the answer
  • Decide how performance will be verified, before commitment

What you should have at the end

  • A feasibility report with an options comparison and recommendation
  • An estimate with its basis and confidence stated
  • A risk register
  • An M&V strategy agreed before the project is committed

Where this usually goes wrong

The M&V strategy is left until after commissioning. By then the baseline metering that would have made verification possible was never installed, and the saving becomes a matter of assertion. Deciding how you will prove it is part of deciding whether to do it.

Related service

Project Feasibility Pack.

Discuss whether this fits

Tell us the problem, the site and the decision you need to reach. If this is not the right service we will say so and point you at the one that is.

United Kingdom and United States enquiries are routed to the same team. We will tell you plainly where we do and do not have local delivery capability.