Establishing whether the programme is actually delivering what it claims, and feeding that back into planning.
What happens
- Verify savings at project level against approved bases
- Reconcile project-level results to the programme baseline
- Test persistence of savings claimed in earlier years
- Feed variance back into how future projects are appraised
What you should have at the end
- Verified performance against the programme baseline
- An explanation of variance
- Revised assumptions for future appraisal
Where this usually goes wrong
Programme reporting aggregates claimed savings from approval documents rather than verified savings from operation. The reported trajectory diverges from the metered position, and the gap is usually discovered by someone external.