The problem this solves
The project is approved and a contractor is engaged. Your exposure now is that the delivered installation quietly differs from what was justified — the design drifts, commissioning is signed off on a nominal basis, and the performance nobody verified turns out not to be there.
The trigger is usually a contractor appointment, an approaching commissioning date, or a performance dispute already underway.
Who it is for
Organisations delivering an energy or utility project who need technical representation on their own side of the table — particularly where the in-house team lacks capacity or specific specialism.
Who it is not for
We do not act as principal designer or principal contractor, and we do not take on statutory duty-holder roles unless that is separately agreed and appropriately covered.
If the project is not yet defined or approved, this is premature.
Scope
Selected to fit the project and your internal capacity:
- Design review. Does what is proposed meet the basis it was approved against, and will it operate and be maintainable?
- Procurement support. Technical specification, tender evaluation, clarification of what is actually being offered.
- Commissioning oversight. Witnessing, review of results, and challenge where evidence is thin.
- Measurement and verification. Executing the M&V plan and reporting what the installation actually achieved.
What you get
- Design review findings, with significance stated rather than a flat list of comments
- Procurement and evaluation support
- Commissioning witness records and challenge where results do not support the claim
- M&V results against the approved basis
The decision this supports: whether to accept the works, and whether the benefits case was actually delivered.
Maturity, assumptions and exclusions
Output relates to work at implementation-ready maturity and beyond.
- We advise the client; we do not supervise or direct the contractor’s work
- Verification is bounded by the metering and baseline available — where these are inadequate we will say so before commissioning, not after
- Scope, attendance and responsibility boundaries are written down before we start, because ambiguity here becomes a dispute later
Commercial structure
Monthly or milestone fee depending on the delivery programme, priced after scoping.