Project Feasibility Pack

Takes a single identified opportunity and develops it far enough to survive capital approval — options, economics, concept design, estimate basis and a verification strategy.

  • Evidence basis: Estimated
  • Technical maturity: Feasibility
A costed, evidenced pack for a single project

The problem this solves

You have an opportunity that looks worth doing, and a capital process that will not approve it on the strength of a spreadsheet. The business case needs a defensible load basis, a genuine comparison of options, an estimate someone will stand behind, and an answer to how you will know afterwards whether it worked.

The trigger is usually a deadline: a capital submission window, a board question, a funding application, or a plant replacement that can no longer be deferred.

Who it is for

Organisations with an identified opportunity and a real decision point ahead of them — a capital committee, a funding gate, a board paper.

Who it is not for

If the opportunity is not yet defined — you know energy is a problem but not which project — start with an Energy Opportunity Sprint.

If the project is already approved and you need it delivered and proven, that is Implementation Assurance.

Scope and stages

  • Load and demand basis. What the plant actually requires, established from data rather than nameplate ratings.
  • Options analysis. A genuine comparison, including doing nothing and doing less, with the discriminating factors made explicit.
  • Project economics. Capital and operating cost, energy and carbon effect, sensitivity to the assumptions that actually move the answer.
  • Concept design. Sufficient definition to support the estimate and expose the integration and constructability issues.
  • Estimate basis. What is included, what is excluded, and the confidence the estimate carries.
  • Risk register. Technical, delivery and operational risks, with the ones that could change the decision identified as such.
  • Measurement and verification strategy. How performance will be demonstrated after commissioning, decided before commitment rather than after.

What you get

  • A feasibility report with the options comparison and recommendation
  • Project economics with sensitivities
  • Concept design and estimate basis
  • Risk register and an M&V strategy

The decision this supports: proceed, defer, or change option — and with what confidence the cost is understood.

Maturity, assumptions and exclusions

Output is at feasibility maturity. The estimate basis states the confidence attached; it is not a tender price and should not be used as one.

  • Not detailed design — no construction issue drawings or specifications
  • No procurement or contractor selection
  • Third-party performance data is reported as vendor-claimed unless independently verified, and labelled accordingly

Where the project touches a GMP process, a pressure system, a hospital critical service, electrical protection or refrigerant safety, the relevant specialist review is included in the scope and named in the report. We do not sign off outside our competence.

Commercial structure

Fixed fee by stage gate, priced after scoping.

Discuss whether this fits

Tell us the problem, the site and the decision you need to reach. If this is not the right service we will say so and point you at the one that is.

United Kingdom and United States enquiries are routed to the same team. We will tell you plainly where we do and do not have local delivery capability.