Capital Cost of Abatement

Movement in the published producer prices of a fixed basket of electrification capital equipment, rebased to 100 at 2019-01

EU27_2020

126.95

index, 2019-01 = 100

2026-07 · monthly

Base period
2019-01 = 100
Observations
259

US

168.64

index, 2019-01 = 100

2026-08 · monthly

Base period
2019-01 = 100
Observations
116

US

90100110120130140150160170180190Jan 2019 = 1002017201820192020202120222023202420252026

Series begins January 2017 · 116 observations

Producer prices of six classes of US electrification capital equipment, equally weighted and rebased to January 2019. Each point is a calendar year mean of the twelve months.

What this figure cannot support

PROVISIONAL FIXED-BASKET PRICE PROXY, not project capex. Producer prices are what manufacturers receive at the factory gate: they exclude installation, enabling works, freight, tariffs and contract terms. Equally weighted because no cleared evidence source yet says which component should weigh more.

How this index is calculated

Table view and CSV
YearMeanMinMaxP25P75n
201795.00094.30095.50094.80095.30012
201898.20096.40099.70097.00099.30012
2019101.100100.000102.300100.600101.70012
2020103.200102.700103.900102.800103.40012
2021110.900104.600118.900106.100115.40012
2022133.000122.100138.800127.800138.00012
2023142.600139.500145.300140.900144.20012
2024148.700145.800151.000147.300149.80012
2025156.600151.400160.400152.800159.90012
2026 (part)164.300161.200168.600162.100166.3008

Download the annual summary as CSV
Download every observation, with its lineage, as CSV

EU27_2020

90100110120130140150160170180190Jan 2019 = 1002017201820192020202120222023202420252026

Series begins January 2005 · 259 observations

Producer prices of five classes of EU27 electrification capital equipment, equally weighted and rebased to January 2019. Each point is a calendar year mean of the twelve months.

What this figure cannot support

PROVISIONAL FIXED-BASKET PRICE PROXY, not project capex. Five NACE classes against the US basket's six NAICS ones — NACE combines motors, generators and transformers where NAICS splits them, so the two composites are not comparable and are never shown on one axis.

How this index is calculated

Table view and CSV
YearMeanMinMaxP25P75n
200584.00083.60084.40083.80084.30012
200685.60084.90086.30085.20086.10012
200788.00087.40088.40087.70088.30012
200889.80088.80090.60089.30090.40012
200991.00090.80091.20090.90091.10012
201091.50091.00091.80091.10091.80012
201193.20092.40094.00092.90093.70012
201294.70094.20095.00094.50094.80012
201395.60095.10095.80095.40095.70012
201496.10095.80096.40095.90096.30012
201596.70096.50096.80096.60096.80012
201697.30097.10097.60097.10097.40012
201798.00097.70098.30097.80098.10012
201899.10098.50099.40098.70099.30012
2019100.30099.900100.700100.000100.50012
2020101.500101.000101.800101.300101.60012
2021103.600101.900106.200102.300105.10012
2022113.700108.200117.700110.500117.20012
2023121.300119.500122.300120.700122.00012
2024123.100122.400123.700122.800123.50012
2025124.600124.200125.100124.300124.80012
2026 (part)126.300125.400127.100125.600127.0007

Download the annual summary as CSV
Download every observation, with its lineage, as CSV

Source attribution

Source: Eurostat.

Source: US Bureau of Labor Statistics, Producer Price Index.

Definition

What it measures
Movement in the published producer prices of a fixed basket of electrification capital equipment, rebased to 100 at 2019-01
Headline metric
index
Supporting metrics
basket composition; component contributions
Cadence
Monthly
Panel
Capital & Infrastructure
Primary sources
bls-ppi; ons-ppi; eurostat
Licence position
clear — public domain/OGL/EC reuse
Release gate
exact series IDs, base month, equal-weight rule, missing-series treatment and revision policy published

What this is not

NOT capex per tonne abated, and not project capital cost. It is the price movement of equipment a decarbonisation project buys — not the cost of a project, and not the cost of the carbon it avoids. Producer prices are what manufacturers receive at the factory gate and exclude installation, enabling works, freight, tariffs and contract terms.

What this does not cover

PROVISIONAL FIXED-BASKET PRICE PROXY, not project capex. No generic machinery series may silently replace a missing technology-specific series.