AI Infrastructure Energisation Gap

Share of publicly announced AI/datacentre MW with explicit evidence of energisation in the open records of each covered market, reported separately per market

US · observed cohort

70%

Texas observed cohort — 2 of 8 projects, single issuer (IREN)

Milestone: substation energisation — evidence found, not capacity operating

With energisation evidence
1,400 of 2,000 MW
Stage unknown
30% of the cohort — no disclosure either way
As at
2026-09

Not published for these capacity bases, because every project in them has an unknown stage: IT capacity (50 MW); Gross connection capacity (4,230 MW)

Eight projects from two issuers, all in Texas. This is an observed cohort and is not a United States denominator. No national ratio may be computed from it.

0255075100No observations yet — this is not a zero.
This index has no observations yet. The axis and the expected first observation are shown so the commitment is visible; no value is implied.

Definition

What it measures
Share of publicly announced AI/datacentre MW with explicit evidence of energisation in the open records of each covered market, reported separately per market
Headline metric
Energisation Evidence Ratio, % of tracked MW, stated per market (US panel leads; GB panel second)
Supporting metrics
per market: MW with energisation evidence; MW approved but not energised; MW in study or review; MW with no studies submitted; unknown-stage MW; record coverage. US stage ladder as published by ERCOT: Observed Energized / Approved to Energize but Not Operational / Planning Studies Approved / Under ERCOT Review / No Studies Submitted
Cadence
Monthly
Panel
Deliverability
Primary sources
ercot Large Load Interconnection Status Update (US); neso exact Open connection datasets and ofgem OGL records (GB); cited public announcements for the announced-MW denominator
Licence position
US: clear – ERCOT Terms of Use section 5 reuse grant, retrieved 2026-09-10, re-verified twice yearly. GB: clear for exact NESO Open/OGL records. Announcement facts: citation-level only.
Release gate
every row has a cited record, stage evidence and observation date; unknown stage reported separately; each market panel carries its own market label, source and stage-definition note; no cross-market blending; the page states which markets are covered and does not describe the figure as global

What this does not cover

PROVISIONAL EVIDENCE PROXY. A missing public energisation record is unknown, not proof of non-energisation; queue position is not energisation. Two markets are not the world: US and GB stage definitions are not identical and the panels are not comparable like-for-like. Covered markets are named on the page and the figure is never labelled global.