Electric Heat Cost Advantage Hours

Share of settlement periods in which electric heat has a lower energy cost than the reference gas boiler

GB_power_UK_gas

99.66

against a gas boiler at 85% HHV efficiency

percent

2026-03 · monthly

Modelled

Observations
120
Annual meanRange within the yearInterquartile range
0102030405060708090100110% of valid settlement periods at COP 32016part2017part2018part2019part2020part2021part20222023202420252026part

Series begins 2016 · 104 observations

Share of GB settlement periods in which electric heat at COP 3 costs less than a gas boiler at 85% efficiency. Energy only.

What this figure cannot support

PROVISIONAL ENERGY-ONLY SCREENING COMPARISON. GB wholesale power against UK non-domestic average gas — two different scopes. Excludes network charges, supplier margins, taxes and capacity charges. Gas ends 2026 Q1, so later months are absent rather than carried forward.

How this index is calculated

Table view and CSV
YearMeanMinMaxP25P75n
2016 (part)91.97188.78696.03689.93993.5643
2017 (part)96.26290.81798.30996.27297.77010
2018 (part)97.25390.78599.12397.25698.49211
2019 (part)99.78199.090100.00099.587100.00011
2020 (part)98.85492.339100.00099.580100.00010
2021 (part)42.2638.12583.68318.36570.0378
202247.5635.98191.86825.01068.80812
202399.97199.798100.00099.983100.00012
202499.70396.976100.00099.983100.00012
202599.48895.901100.00099.639100.00012
2026 (part)98.99097.37999.92698.52299.7953

Download the annual summary as CSV
Download every observation, with its lineage, as CSV

What was assumed

ParameterValueEvidenceBasis
(GB_power_UK_gas, GB_power_UK_gas, GB_power_UK_gas, GB_power_UK_gas)

Source attribution

Elexon BMRS data licence; DESNZ Quarterly Energy Prices under the Open Government Licence v3.0.

Definition

What it measures
Share of GB settlement periods in which electric heat costs less than a reference gas boiler, at a selectable COP
Headline metric
% of valid periods at reference COP 3
Supporting metrics
% at resistance (efficiency 0.98); % at COP 2; % at COP 4; hours count; N valid periods
Cadence
Monthly
Panel
Economics & Flexibility
Primary sources
elexon-bmrs-data; desnz-qep
Licence position
clear — BMRS data licence and OGL; automated API access excluded from day-one path
Release gate
manual/licensed data export archived; negative-price treatment defined; >=95% settlement coverage; gas-price mapping frozen

What this does not cover

PROVISIONAL MODEL. Wholesale electricity is compared with a monthly gas benchmark; network charges, levies and demand charges are excluded.