    "set_id": "grid",
    "set_name": "Grid & enabling",
    "version": "2026.1",
    "status": "seed",
    "published": "2026-11-01",
    "base_currency": "USD",
    "base_region": "NA",
    "accuracy": {
        "class": "AACE Class 5",
        "definition": "0–2% project definition, concept screening",
        "low_pct": [
            -20,
            -50
        ],
        "high_pct": [
            30,
            100
        ],
        "source": "AACE International Recommended Practice 18R-97"
    },
    "location_factors": {
        "_comment": "Location factors are ESTIMATED and INPUT-PRICE ONLY - they exclude delivery-environment cost. Published with a range and a coverage grade in data/location-factors-2026.1.json; the range must be shown wherever the point value is. Base region NA = 1.000 by definition (US Gulf Coast). See 16-location-factors.md.",
        "NA": 1,
        "EU": 0.957,
        "APAC": 0.931,
        "SAM": 0.931,
        "MEA": 0.887
    },
    "sources": [
        {
            "id": "doe-lpt",
            "title": "Large Power Transformers and the U.S. Electric Grid",
            "publisher": "US DOE",
            "url": "https://www.energy.gov/sites/prod/files/Large%20Power%20Transformer%20Study%20-%20June%202012_0.pdf",
            "licence": "US federal — public domain",
            "cost_year": 2011
        },
        {
            "id": "doe-xfmr-rule",
            "title": "Distribution transformer energy conservation standards rulemaking, Appendix 5B",
            "publisher": "US DOE",
            "url": "https://downloads.regulations.gov/EERE-2010-BT-STD-0048-0760/attachment_21.pdf",
            "licence": "US federal — public domain",
            "cost_year": null
        },
        {
            "id": "miso-mtep",
            "title": "Transmission Cost Estimation Guide for MTEP24",
            "publisher": "MISO",
            "url": "https://cdn.misoenergy.org/20240501%20PSC%20Item%2004%20MISO%20Transmission%20Cost%20Estimation%20Guide%20for%20MTEP24632680.pdf",
            "licence": "NOT CLEARED — MISO is not a government body; written reuse confirmation required before publication",
            "cost_year": 2023
        }
    ],
    "equipment": [
        {
            "id": "powerTransformer",
            "name": "Power transformer",
            "status": "seeded",
            "model": "lookup_power_law",
            "c_ref_basis": "equipment",
            "rating": {
                "unit": "MVA",
                "label": "MVA",
                "basis": "FOB factory, nameplate MVA",
                "note": "MVA is NOT MW. MW = MVA × power factor. The calculator must not silently equate them.",
                "second_dimension": {
                    "key": "voltage_class",
                    "label": "Voltage class",
                    "required": true,
                    "reason": "Cost per MVA varies roughly fourfold across voltage classes. Without it the answer is meaningless."
                }
            },
            "s_ref": 500,
            "c_ref": 4000000,
            "c_ref_cost_year": 2011,
            "needs_reanchoring": true,
            "n_eqp": 0.75,
            "n_inst": null,
            "icm_ref": 1.275,
            "variants": [
                {
                    "voltage_class": "230/115 kV",
                    "s_ref": 300,
                    "c_ref": 2000000
                },
                {
                    "voltage_class": "345/138 kV",
                    "s_ref": 500,
                    "c_ref": 4000000
                },
                {
                    "voltage_class": "765/138 kV",
                    "s_ref": 750,
                    "c_ref": 7500000
                }
            ],
            "default_variant": "345/138 kV",
            "valid_min": 75,
            "valid_max": 900,
            "max_single_unit": 900,
            "evidence": "estimated",
            "fit": {
                "method": "published exponent, not regressed here",
                "source_id": "doe-xfmr-rule"
            },
            "sources": [
                "doe-lpt",
                "doe-xfmr-rule"
            ],
            "cross_check": {
                "source_id": "miso-mtep",
                "metric": "USD per MVA by voltage class",
                "cost_year": 2023,
                "range_low": {
                    "class": "115/115 kV",
                    "usd_per_mva": 4564
                },
                "range_high": {
                    "class": "765/765 kV",
                    "usd_per_mva": 18475
                },
                "status": "NOT CLEARED for publication — reuse terms unconfirmed. Held for internal validation only."
            },
            "notes": "CRITICAL — n = 0.75 is DOE's WITHIN-VOLTAGE-CLASS exponent on kVA. Fitting a curve straight through the three variant points instead gives 1.44, an apparent diseconomy, because voltage class rises with size and voltage does most of the work. The calculator must scale WITHIN a selected voltage class only, never across them. ICM 1.275 from DOE's stated installed premium of 25–30% over FOB factory."
        }
    ]
}